Logisticus Group’s third solar Safe Harbor warehouse – located in Redlands, CA – is wrapping up component receiving after operations launched Jan. 13.
A fourth major solar-focused warehousing operation in Kansas has just begun receipt of modules this week at one of our existing locations. This Phase II receiving effort is estimated to last one month.
Our first three solar warehouses combined have successfully received, inspected, validated + stored in excess of one million solar modules to cover an area square footage equal to nearly 16 football fields (including end zones)!
Thank you to our staff for the tremendous coordination of daily warehouse activities. Special thanks to Warehousing Team Lead Sam Griebel, with assistance from Warehouse Specialist Conner Klein in setup + ensuring smooth operational launches.
Learn more about each of our existing warehouse locations below.
SOLAR WAREHOUSE LOCATIONS
REDLANDS, CA
⇢ SIZE
150,000 sf
⇢ COMPONENTS
We’re beginning to wrap up the receiving phase, during which we’ve compactly filled the space with 105,000+ stacked pallets of solar components. Each day during this process, we have received + inventoried 16 containers with 22 pallets, each containing 30 solar panels.
⇢ OPS KICKOFF
January 2020
⇢ STAFF
Andy Ash is the managing Field Operative (FO). Three other forklift drivers, who are notably great employees staffed for this particular operation, did live onsite training prior to launch + brought in badges to show they were certified.
KANSAS CITY, KS
⇢ SIZE
330,000 sf
⇢ COMPONENTS
> 16,000 pallets containing > 560,000 individual panels will stay in temperature controlled + 24/7 surveilled storage until they are shipped out to projects across the country.
⇢ OPS KICKOFF
October 2019
⇢ STAFF
Edwin Delgado is the managing FO.
⇢ HIGHLIGHTS
This was our first Solar Safe Harbor location and is the largest warehouse operation at this time.
NEW CENTURY, KS
⇢ SIZE
310,000 sf
⇢ COMPONENTS
This warehouse location has just entered its second major project phase of receiving solar modules.
⇢ OPS KICKOFF
October 2019
⇢ STAFF
Randall Straus is the managing FO.
⇢ HIGHLIGHTS
174,000 sf of the space was designated for components received during Phase I. Phase II inventory will occupy 136,000 sf of the facility.
OTHER LOCATIONS
Logisticus Group transports, inspects, repairs, refurbishes, catalogs in our proprietary inventory system + securely stores wind turbine fixtures for domestic or international customers.
We stuff containers, store equipment + customer cargo, transload from container to truck, and ship out to the original manufacturer (OEM) via any mode of transport – or combination thereof – in an expertly nested + secured way (even overseas).
Additionally, we build custom engineered storage pads to safely house transformers + associated components longterm.
We also offer other large container storage services for both short-term + long-term periods.
HOUSTON, TX
⇢ SIZE
25,000 sf
⇢ COMPONENTS
We refurbish + store wind components at this location, where we processed upward of 12,000 fixtures just last year.
We also provide large container storage + store transformers.
⇢ OPS KICKOFF
December 2018
⇢ STAFF
Benjamin Fry is the managing FO.
⇢ HIGHLIGHTS
Our award-winning Houston operation includes service of three separate customers. We also offer a varied hybrid of storage solutions at this location. This unique set of warehousing services is the only operation of its kind in the Houston area.
COMANCHE, IA
⇢ SIZE
55,000 sf
⇢ COMPONENTS
To date we have processed more wind turbine blade fixtures at this facility than necessary to outfit > 7,000 wind turbines.
⇢ OPS KICKOFF
March 2017
⇢ STAFF
Brant Massa is the managing FO.
⇢ HIGHLIGHTS
In 2019, we shared our facility, resources + staff with community volunteers to fill/move sandbags in an organized effort to combat destructive flooding in the area.
In 2018, U.S. Rep. for Iowa’s 2nd congressional district, Dave Loebsack, visited upon invitation of a prominent area business leader, who showcased our local work in the clean energy sector + commercial contributions to the local economy.
TENNESSEE, IL
⇢ SIZE
15 acres
⇢ COMPONENTS
Multi-purpose use for various wind projects, including past efforts such as 1) full wind turbine component lay-downs using two 150t cranes; 2) 90m tower section storage.
⇢ OPS KICKOFF
January 2019
⇢ HIGHLIGHTS
This is an outdoor storage lay-down yard. Our services include loading, hauling, offloading, communications + swiftly mobilizing a full staff on-site whenever the need arises. On-site personnel monitors safety, coordinates truck arrivals/departures + monitors vehicle overcrowding and more.
DO YOU NEED STANDARD / INDUSTRIAL WAREHOUSING OR LAY-DOWN SERVICES?
Reach out to us if you need short or long-term support on your wind and/or solar projects – including warehousing, unload/load out + transport to project sites – all combined with an in-house inventory management system with real time visibility.
Learn more about our warehousing initiatives and the accompanying, unique capabilities of Logisticus Technology System (LTS).