PROJECT UPDATE: Successful transport of 30 complete GE2.82MW wind turbines / / OK

Jun 9, 2020 | Case Studies

Logisticus recently wrapped a short-term delivery project for our customer in Oklahoma. The scope involved the transport of wind components from a nearby lay-down location to their final destination (a wind project site).

Highlights
  • We moved 30 complete GE2.82MW turbines. (Watch a video of installation of one of these turbines here.)
  • Our team deployed a complete turbine set of tractors/trailers equipped with our GPS – a highlight of our proprietary system, Logisticus Technology Solutions – for tracking.

 

An example screen grab of the proprietary Logisticus Technology Solutions (LTS) GPS component tracking we utilize to communicate in real-time to our transport customers.

 

  • Custom geofences were added providing an alert upon 1. exit at origin and 2. entry at project site – giving further visibility to the site team.
  • Our team and the site crews persevered through challenging road conditions and worked weekends to offset wind + weather days to get all turbine components delivered as quickly as possible.

 

Two large cranes lift equipment on a construction site with a dirt road, a white van, and a flatbed truck under a bright blue sky with scattered clouds. Fields and wind turbines are visible in the background.

Two large cranes lift a wind turbine component onto a truck on a dirt road, surrounded by workers, vehicles, and construction equipment under a partly cloudy sky.

A red semi-truck transports a large wind turbine blade along a rural dirt road, with other vehicles and power lines visible, and wind turbines in the background under a partly cloudy sky.

A large crane is helping to assemble or repair a wind turbine in a rural field with trees in the background under a cloudy sky.

DO YOU NEED SIMILAR SERVICES?

Reach out to us if you need short or long-term support on your wind and/or solar projects – including warehousing, unload/load out + transport to project sites – all combined with custom in-house inventory management system with real time visibility.

Learn more about our warehousing initiatives and the accompanying, unique capabilities of Logisticus Technology System (LTS).

Newsletter Signup

Recent Posts

What It Really Takes to Repower a Wind Farm

What It Really Takes to Repower a Wind Farm

By the time most operators decide to repower, the case is already clear. The turbines are aging, the technology has moved on, and the site still holds the two things that are hardest to secure in wind energy: an approved permit and a live grid connection. Repowering...